Challenge:

This impressive 24/7 mission critical facility is responsible for the monitoring and maintenance of a large telecommunications infrastructure. The challenge for our teams was to relocate the existing Network Operations Center to its new home and integrate the existing video wall with the newer technology, while installing a completely new video wall all within a five-week time span.

Solution:

The new facility features two complete video walls that are comprised of twelve Barco cubes and twelve 50" plasma screens in the Network Operations Center. The adjacent War Room also has a 50" plasma display and videoconferencing capabilities. Due to the critical nature of Progress Telecom's service, duplicate systems were installed as a fail-safe measure. The project was fast-tracked to successful completion under a short deadline.


Equipment Highlights:

Multimedia control system with integrated controls via touch screen; video wall comprised of Barco 67" diagonal cubes; NEC 50" plasma screens; high-fidelity audio system and video teleconferencing system

Progress Telecom Network Operations Center Progress Telecom Network Operations Center Progress Telecom Network Operations Center
Request Information from CRG
CRG Blog